首页> 美国政府科技报告 >National Dam Safety Program. Lower North River Dam Number 78 (Briery Branch) (VA 16502). Potomac River Basin. Rockingham County, State of Virginia. Phase I Inspection Report.
【24h】

National Dam Safety Program. Lower North River Dam Number 78 (Briery Branch) (VA 16502). Potomac River Basin. Rockingham County, State of Virginia. Phase I Inspection Report.

机译:国家大坝安全计划。下北河大坝78号(布里里分公司)(Va 16502)。波托马克河流域。罗金厄姆县,弗吉尼亚州。第一阶段检查报告。

获取原文

摘要

The purpose of a Phase I investigation is to identify expeditiously those dams which may pose hazards to human life or property. The assessment of the general conditions of the dam is based upon available data and visual inspections. Detailed investigation and analyses involving topographic mapping, subsurface investigations, testing, and detailed computational evaluations are beyond the scope of a Phase I investigation; however, the investigation is intended to identify any need for such studies. Based upon the field conditions at the time of the field inspection and all available engineering data, the Phase I report addresses the hydraulic, hydrologic, geologic, geotechnic, and structural aspects of the dam. The engineering techniques employed give a reasonably accurate assessment of the conditions of the dam. It should be realized that certain engineering aspects cannot be fully analyzed during a Phase I inspection. Assessment and remedial measures in the report include the requirements of additional indepth study when necessary. Phase I reports include project information of the dam and appurtenances, all existing engineering data, operational procedures, hydraulic/hydrologic data of the watershed, dam stability, visual inspection report and an assessment including required remedial measures.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号