首页> 美国政府科技报告 >National Dam Safety Program. New Croton Reservoir Dam (Number 46), Hudson River Basin, Westchester County, New York. Phase I Inspection Report.
【24h】

National Dam Safety Program. New Croton Reservoir Dam (Number 46), Hudson River Basin, Westchester County, New York. Phase I Inspection Report.

机译:国家大坝安全计划。新克罗顿水库大坝(46号),哈德逊河流域,威彻斯特县,纽约。第一阶段检查报告。

获取原文

摘要

This report provides information and analysis on the physical condition of the dam as of the report date. Information and analysis are based on visual inspection of the dam by the performing organization. New Croton Reservoir Dam was judged to be safe although further investigation and observation of the spillway should be made. (Author)

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号