首页> 美国政府科技报告 >National Dam Inspection Program. Bull Run Dam (NDI PA-463), Ohio River Basin, Bull Run, Westmoreland County, Pennsylvania. Phase I Inspection Program.
【24h】

National Dam Inspection Program. Bull Run Dam (NDI PA-463), Ohio River Basin, Bull Run, Westmoreland County, Pennsylvania. Phase I Inspection Program.

机译:国家大坝检查计划。 Bull Run Dam(NDI pa-463),俄亥俄河流域,Bull Run,威斯特摩兰县,宾夕法尼亚州。第一阶段检验计划。

获取原文

摘要

Based on a visual inspection and review of available engineering data, Bull Run dam and its appurtenances are considered to be in good structural condition. The spillway is capable of discharging the flow resulting from a storm of PMF intensity and is, thus, considered adequate. Required maintenance is poor, however, and it is recommended that the owner develop a program that will implement the procedures and operations provided for in the 'Operation and Maintenance Manual.'

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号