首页> 美国政府科技报告 >National Program for Inspection of Non-Federal Dams. Somerset Reservoir Dam (MA 00792), Massachusetts-Rhode Island Coastal Basin, Somerset, Massachusetts. Phase 1 Inspection Report
【24h】

National Program for Inspection of Non-Federal Dams. Somerset Reservoir Dam (MA 00792), Massachusetts-Rhode Island Coastal Basin, Somerset, Massachusetts. Phase 1 Inspection Report

机译:国家非联邦大坝检查计划。萨默塞特水库大坝(ma 00792),马萨诸塞州罗德岛州沿海盆地,萨默塞特,马萨诸塞州。第1阶段检验报告

获取原文

摘要

The reservoir was formed by an intermediate size dam to create an offstream water supply for the town of Somerset. The dam consists of an earth embankment about 6700 ft. long with a maximum height of 45 ft. The earth embankment is generally in excellent to good condition. Recommendations for additional investigations of the cause and extent of embankment seepage and the effect of seepage on slope stability are included in the report. (Author).

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号