National Program for Inspection of Non-Federal Dams. Robinson Pond Dam (MA 00670), French River Basin, Oxford, Massachusetts. Phase 1 Inspection Report

机译:国家非联邦大坝检查计划。罗宾逊池塘坝(ma 00670),法国河流域,牛津,马萨诸塞州。第1阶段检验报告

获取原文

摘要

Robinson Dam is a dry-stone masonry and earth dam which was constructed around 1838. The dam has a maximum height of 15-feet and is approximately 850 feet long. It is comprised of a 500-foot long, 4-foot high earth dike section on the north and 350-foot long, 4-to 15-foot high, dry-stone masonry and earth dam section on the south. These sections are separated by a 10-foot wide by 3.5-foot high mortared stone masonry spillway which discharges into a 7-foot high by 2-foot wide sluiceway. Generally the dam is considered to be in poor to fair condition. However, there are several visible signs of distress which indicates a potential hazard at this site: bulging of the stone wall on the downstream face of the dam, uncontrolled discharge through a blocked outlet conduit, slight-to-moderate seepage at the downstream toe of the dam, erosion on the upstream face of the dam, accumulation of debris in the spillway channel, and recent unauthorized filling of the dam crest. An inflow test flood of 1,250 cfs (one-half of about 1.0 feet.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号