首页> 美国政府科技报告 >National Program for Inspection of Non-Federal Dams. Springfield Water Works Intake (MA 00708) Connecticut River Basin, Russell, Massachusetts. Phase 1 Inspection Report
【24h】

National Program for Inspection of Non-Federal Dams. Springfield Water Works Intake (MA 00708) Connecticut River Basin, Russell, Massachusetts. Phase 1 Inspection Report

机译:国家非联邦大坝检查计划。斯普林菲尔德水厂进水口(ma 00708)康涅狄格河流域,马萨诸塞州拉塞尔。第1阶段检验报告

获取原文

摘要

The Springfield Water Works Intake dam is an approximate 295 foot long concrete masonry structure spanning a gorge in the Little River. This dam is built on a 180 foot radius and appears to be functioning as an arch. The visual inspection of this dam did not disclose any findings that indicate an unsafe condition. The spillway for this dam is able to pass a 1/2 PMF flow from its own drainage area of 3.15 s.m. It must be noted however, that the Cobble Mountain Reservoir, some 2.75 miles upstream, could affect the flow at this site. Should the Cobble Mountain Reservoir be full and overflowing its spillway at a time of flooding conditions, the flow at this site would change significantly. It is recommended that the owner have repairs made to certain spalled areas of the intake structure and wasteway.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号