首页> 美国政府科技报告 >Proposed Demolition of Hangars; Projects 11-0098-11-0102 Environmental Assessment.
【24h】

Proposed Demolition of Hangars; Projects 11-0098-11-0102 Environmental Assessment.

机译:建议拆除机库;项目11-0098-11-0102环境评估。

获取原文

摘要

The 92 Air Refueling Wing has conducted an environmental assessment (EA) to document the environmental impacts associated with demolishing Hangars 1021, 1023, 1024, 1025, and 1026 on Fairchild AFB. In response to the Air Force directive to reduce facility space by 20% by 2020, Fairchild AFB has identified several opportunities for demolition to include the five hangars addressed in this EA. This proposal was documented along with a no action alternative, and alternatives considered but not carried forward due to infeasibility. The no action alternative was found to not meet the objective or the selection criteria of the purpose and need of the proposed action, but was carried forward as a requirement of NEPA. This document incorporates by reference the Environmental Analysis of the Proposed Demolition of Hangars, Projects 11-0098- 11-0102, dated 22 March 2012. The purpose of the proposed action is to comply with the USAF HQ directive known as '20/20 by 2020', which requires that AF Installations' reduce the physical plant by 20% ... , by 2020'. Fairchild AFB is working toward this goal by finding excess space that isn't economical to restore for other purposes and programming it for demolition. The Proposed Action will demolish five hangars on the airfield, leaving 18 hangars in place. The current missions at Fairchild AFB require 7 hangars, so the Proposed Action would leave 11 excess hangars on the airfield.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号