首页> 美国政府科技报告 >Environmental Assessment for the Replacement of the JP-8 Transfer Pipeline between the 6000 Area and 400 Area at Tyndall Air Force Base Bay County, Florida.
【24h】

Environmental Assessment for the Replacement of the JP-8 Transfer Pipeline between the 6000 Area and 400 Area at Tyndall Air Force Base Bay County, Florida.

机译:佛罗里达州廷德尔空军基地6000区和400区之间替换Jp-8输送管道的环境评估。

获取原文

摘要

This document supports the Environmental Impact Analysis Process at Tyndall AFB, Florida for the replacement of a fuel transfer pipeline at the base. The proposed action involves replacing the existing 7,500 linear foot underground fuel pipeline connecting the Bulk Fuel Storage Area (6000 Area) and the Refueling Operating Area (400 Area). The existing pipeline consists of single-walled piping that has no leak detection system. This existing pipeline does not comply with the current Florida Department of Environmental Protection (FDEP) regulation (Florida Administrative Code 62-761.511(2)(d)), which requires tank systems to be double-walled construction if underground. To prevent further noncompliance, FDEP and the Air Force entered into a consent order (Office of General Counsel File Number 09-4068) to allow the Defense Logistics Agency (DLA) sufficient time to get projects funded and make the necessary upgrades to the bulk fuel storage tanks and fuel transfer pipeline to bring them into regulatory compliance. The consent order provides a legal mechanism for the base to continue operating the bulk fuel storage tanks and fuel transfer pipeline past the 1 January 2010 regulatory deadline while upgrades are planned and implemented. Moreover, as part of the Air Force's response, DLA proposed a schedule of actions that included a commitment to fund the required upgrades and complete construction by the 2018 deadline established in the consent order. This EA focuses on the replacement of the JP-8 transfer pipeline. Three different pipeline alignments between the 6000 Area and 400 Area are evaluated as part of this EA. The three proposed alignments form the three different action alternatives considered. A no action alternative is also evaluated.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号