首页> 美国政府科技报告 >National Program for Inspection of Non-Federal Dams. Sewalls Falls Dam (NH 00091), Merrimack River Basin, Concord, New Hampshire, Phase 1 Inspection Report
【24h】

National Program for Inspection of Non-Federal Dams. Sewalls Falls Dam (NH 00091), Merrimack River Basin, Concord, New Hampshire, Phase 1 Inspection Report

机译:国家非联邦大坝检查计划。 sewalls Falls Dam(NH 00091),merrimack River Basin,康科德,新罕布什尔州,第1阶段检验报告

获取原文

摘要

The dam is a run of the river type dam. It is 633 ft. long with a maximum height of 35.9 ft. The visual inspection of the dam revealed that the dam is in generally fair condition. Noted were some minor cracking and spalling of concrete on the abutments and the poor condition of the gates and mechanical operators. It is intermediate in size with a significant hazard potential. Keywords include: DAMS, INSPECTION, DAM SAFETY, Merrimack River Basin, Concord, New Hampshire, and Merrimack River.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号