首页> 美国政府科技报告 >Technical Factors in Small Hydropower Planning
【24h】

Technical Factors in Small Hydropower Planning

机译:小水电规划中的技术因素

获取原文

摘要

The Hydrologic Engineering Center, Corps of Engineers, is preparing a document entitled 'Manual for the Determination of the Feasibility of Adding Small Hydroelectric Power to an Existing Facility.' The manual is designed for use by public agencies (federal, state and local), public and private utilities, and private investors. It focuses upon the concepts, technology, and economic and financial issues unique to small hydropower additions. This paper discusses issues related to engineering and economic considerations in planning small hydropower additions, presents an overview of significant findings of the investigation to data, and provides a status report on manual preparation. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号