首页> 美国政府科技报告 >Modifications to Filling and Emptying System of Lock Number 1, Mississippi River, Minneapolis, Minnesota; Hydraulic Model Investigation
【24h】

Modifications to Filling and Emptying System of Lock Number 1, Mississippi River, Minneapolis, Minnesota; Hydraulic Model Investigation

机译:明尼苏达州明尼阿波利斯密西西比河1号船闸填充和排空系统的改造;水力模型研究

获取原文

摘要

The existing locks at Locks and Dam No. 1 were constructed between 1929 and 1932. Problems have been experienced with accumulation of ice and debris at the intakes, air entrapment in the the culverts of the filling and emptying system, excessive turbulence in the lock chamber during filling, and hazardous conditions downstream from the locks during emptying operations. Also, the stoney gates used for control of filling and emptying, the miter gates, and miter gate operating machinery are in bad condition. Various elements of the filling and emptying system were developed in a 1:25-scale hydraulic model for use in rehabilitating the locks. Both the landward and riverward locks were investigated and recommended design and modifications were furnished to accomplish rehabilitation of both locks although only the landward lock will be completely rehabilitated. Major modifications to the locks will include constructing new intake manifolds, lowering the roof of the filling and emptying culverts and changing their shape, constructing new sidewall ports, replacing the stoney gates with tainter valves, and constructing new culvert outlets. With the rehabilitated system, the lock could be filled in 10.2 min and emptied in 10.6 min with a 4-min valve time and a 37.8-ft lift. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号