首页> 美国政府科技报告 >Pneumatic Control Device for the Pershing II Adaption Kit
【24h】

Pneumatic Control Device for the Pershing II Adaption Kit

机译:用于pershing II适配套件的气动控制装置

获取原文

摘要

A preliminary operating model (POM) for the Pneumatic Control Device (PCD) has been developed and is in line with the referenced contractual requirements. The PCD preliminary design was formulated and documented in the 31 August, 1977 Interim Technical Report. Development effort for the pneumatic control POM includes the completion of all detail drawings and their revisions, breadboard tests of the reentry sensor and gas generator, fabrication of POM parts, assembly and evaluation of the first POM, gas generator tests with POM parts for the generator and valve, interface and demonstration of PCD with SACA POM units, preparation for and completion of the twelve contractually required gas generator tests, support of the five gas generator/turboalternator compatibility tests at Garrett, analysis and verification testing of cold gas generator anomaly observed during compatibility tests, completion of the preliminary safety and reliability analysis, and preparation of associated software. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号