首页> 美国政府科技报告 >National Dam Inspection Program. Little Youghiogheny River Site Number 7 (NDI-ID-MD-32), Ohio River Basin, Main Branch of the Little Youghiogheny River, Garrett County, Maryland. Phase I Inspection Report.
【24h】

National Dam Inspection Program. Little Youghiogheny River Site Number 7 (NDI-ID-MD-32), Ohio River Basin, Main Branch of the Little Youghiogheny River, Garrett County, Maryland. Phase I Inspection Report.

机译:国家大坝检查计划。小Youghiogheny河站点7号(NDI-ID-mD-32),俄亥俄河流域,小Youghiogheny河的主要分支,马里兰州加勒特县。第一阶段检查报告。

获取原文

摘要

Little Youghiogheny Site No. 7 consists of an earthfill embankment approximately 700 ft. long, with a maximum toe to crest height of 45 ft. and a crest width of 16 ft. The upstream embankment slope is inclined 4H:1V between the embankment toe and berm located at normal pool level, and 3H:1V between the berm and dam crest. The downstream embankment slope is inclined 2.5H:1V, and has a 10 ft. wide berm located 25 ft. below the top of the dam. Seepage control provisions consist of a filter trench collector system and a blanket drain and corrugated metal pipe outlet system. Filter trench extensions are located about 90 ft. upstream from the downstream embankment toe and are extended a maximum of 14 ft. below original ground. Collected seepage water is discharged into the outlet plunge pool. Flood discharge facilities consist of a principal spillway riser, located 325 ft. from the north abutment, and an emergency spillway channel located on the south abutment.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号