首页> 美国政府科技报告 >National Dam Safety Program. H. B. Norton Dam PA No Name No. 42 (NDI-PA-00385, PennDER No. 24-35), Ohio River Basin, Big Mill Creek, Elk County, Pennsylvania. Phase I Inspection Report.
【24h】

National Dam Safety Program. H. B. Norton Dam PA No Name No. 42 (NDI-PA-00385, PennDER No. 24-35), Ohio River Basin, Big Mill Creek, Elk County, Pennsylvania. Phase I Inspection Report.

机译:国家大坝安全计划。 H. B. Norton Dam pa No Name No. 42(NDI-pa-00385,pennDER No. 24-35),Ohio River Basin,Big mill Creek,Elk County,pennsylvania。第一阶段检查报告。

获取原文

摘要

The H. B. Norton Dam consists of an earthfill embankment approximately 37 feet high and 675 feet long. A 75-foot wide, concrete ogee spillway is located at the right abutment, and a 150-foot wide emergency spillway is located at the left abutment. Seepage control is provided by a steel core wall comprised of 72-inch by 96-inch by 1/4-inch steel sheets, which are riveted and welded in place. The downstream embankment rises at a slope of 2 horizontal to 1 vertical (2H:1V) to the crest at elevation 1422.4 feet. The upstream slopes rise at 2.5H:1V to elevation 1412 feet and then 2H:1V to the 12-foot wide crest. The upstream face is lined with well-placed sandstone riprap, typically 1- to 2-foot square. The ogee type spillway has a crest elevation of 1415 feet, or 7 feet lower than the top of dam. Approximately 225 feet to the left of the ogee spillway is a concrete screen chamber built into the embankment. The intake consists of two pipes, a 16-inch cast-iron pipe with an invert elevation of 1400 feet and a 36-inch cast-iron pipe with an invert at elevation 1386.0 feet.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号