首页> 美国政府科技报告 >National Dam Inspection Program. Griffin Dam (NDI PA-035, PA-455), Susquehanna River Basin, West Beechwood Run, Tioga County, Pennsylvannia. Phase I Inspection Report.
【24h】

National Dam Inspection Program. Griffin Dam (NDI PA-035, PA-455), Susquehanna River Basin, West Beechwood Run, Tioga County, Pennsylvannia. Phase I Inspection Report.

机译:国家大坝检查计划。 Griffin Dam(NDI pa-035,pa-455),susquehanna River Basin,West Beechwood Run,Tioga County,pennsylvannia。第一阶段检查报告。

获取原文

摘要

Based on a visual inspection, past performance, and available engineering data, the facility is considered to be in excellent condition. The emergency spillway is capable of discharging the peak inflow resulting from a storm of PMF intensity, as determined by the Corps of Engineers (HEC-1) procedures, and is thus considered adequate. The adequacy of the seepage control measures, which could be considered minimal, should be observed and evaluated during higher pool or flood conditions. It is recommended that the operation and maintenance procedures listed in the owners' operation and maintenance agreement be formalized into a manual and kept available to ensure the continued proper care of the facility. Provision should be made to include a formal warning system to provide for and establish procedures to protect the lives and property of downstream residents during emergency conditions.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号