首页> 美国政府科技报告 >National Dam Safety Program. Kirkwood Lake Dam (NJ-00399). Delaware River Basin. Cooper River, Camden County, New Jersey. Phase 1 Inspection Report
【24h】

National Dam Safety Program. Kirkwood Lake Dam (NJ-00399). Delaware River Basin. Cooper River, Camden County, New Jersey. Phase 1 Inspection Report

机译:国家大坝安全计划。柯克伍德湖大坝(NJ-00399)。特拉华河流域。库珀河,新泽西州卡姆登县。第1阶段检验报告

获取原文

摘要

This report cites results of a technical investigation as to the dam's adequacy. The inspection and evaluation of the dam is as prescribed by the National Dam Inspection Act, Public Law 92-367. The technical investigation includes visual inspection, review of available design and construction records, and preliminary structural and hydraulic and hydrologic calculations, as applicable. An assessment of the dam's general condition is included in the report. (Author)

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号