首页> 美国政府科技报告 >National Program for Inspection of Non-Federal Dams, Mollywocket Brook Dam (NH 00076), Androscoggin River Basin, Success, New Hampshire. Phase I Inspection Report
【24h】

National Program for Inspection of Non-Federal Dams, Mollywocket Brook Dam (NH 00076), Androscoggin River Basin, Success, New Hampshire. Phase I Inspection Report

机译:国家非联邦大坝检查计划,mollywocket Brook大坝(NH 00076),安德罗斯科金河流域,成功,新罕布什尔州。第一阶段检查报告

获取原文

摘要

The dam is a concrete core earth embankment dam, about 300 ft. long and 29 ft. high. A concrete spillway structure containing primary and emergency spillways controls the flow of water of the dam. It is small in size with a low hazard potential. It is judged to be in poor condition. The dam has been overtopped at least once since its original construction. (Author)

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号