首页> 美国政府科技报告 >National Program for Inspection of Non-Federal Dams. North Pond Dam (CT 00450), Housatonic River Basin, Goshen, Connecticut, North Pond Dikes (CT 00681), Housatonic River Basin, Norfolk, Connecticut. Phase I Inspection Program
【24h】

National Program for Inspection of Non-Federal Dams. North Pond Dam (CT 00450), Housatonic River Basin, Goshen, Connecticut, North Pond Dikes (CT 00681), Housatonic River Basin, Norfolk, Connecticut. Phase I Inspection Program

机译:国家非联邦大坝检查计划。 North pond Dam(CT 00450),Housatonic River Basin,Goshen,Connecticut,North pond Dikes(CT 00681),Housatonic River Basin,Norfolk,Connecticut。第一阶段检验计划

获取原文

摘要

The dam consists of an embankment at the south end of the pond and two dikes at the northeast end of the pond. The approximately 19.5 foot high dam on Hart Brook is an earth embankment approximately 325 feet in length including, at the left end of the dam, a 37 foot long rounded, broad-crested concrete spillway founded on rock. The two dikes along the northeast edge of the reservoir are referred to in this report as the North Dike and the South Dike. The dikes are about 8 feet and 15 feet high respectively, on the downstream side. The shape of the dikes is very irregular; the crest elevation is not constant, and is, on the average, four feet lower than the crest of the dam. Based upon the visual inspections, the dam appears to be in good condition while the dikes appear to be in poor condition. No evidence of instability was observed in the dam or dikes, however, the height of the dikes is inadequate; the dikes have an irregular configuration and excessively steep slopes; there is extensive tree and brush growth on the dikes and seepage through the dikes and dam. The spillway capacity to the point of overflow of the dikes is 120 cfs which is equivalent to 10% of the routed test flood outflow.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号