首页> 美国政府科技报告 >Operational Simulation of a Reservoir System with Pumped Storage
【24h】

Operational Simulation of a Reservoir System with Pumped Storage

机译:抽水蓄能系统的运行模拟

获取原文

摘要

The Richard B. Russell Dam and Lake Project is presently under construction and is being placed in tandem between Hartwell and Clark Hill, two existing multipurpose hydropower plants on the Savannah River. System operational simulations were performed in support of a feasibility study for the installation of pump turbines at Russell, using a version of the Corps of Engineers HEC-5C computer program modified for system power and pumped storage. Information developed from the simulations include system hydropower production, pumping energy requirements, daily reservoir pool fluctuations, and reservoir elevation statistics. This information was useful in judging the effects of the addition of pumped storage on system hydropower production and reservoir recreation useability, as well as in ascertaining efficient system operational methods. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号