首页> 美国政府科技报告 >National Program for Inspection of Non-Federal Dams. West Hill Pond Dam (VT 00083) Winooski River Basin, Cabot, Vermont. Phase I Inspection Report
【24h】

National Program for Inspection of Non-Federal Dams. West Hill Pond Dam (VT 00083) Winooski River Basin, Cabot, Vermont. Phase I Inspection Report

机译:国家非联邦大坝检查计划。 West Hill pond Dam(VT 00083)Winooski River Basin,Cabot,Vermont。第一阶段检查报告

获取原文

摘要

The earth dam is 202 ft. long and 11.1 ft. high. It is small in size with a significant hazard potential. The dam was found to be in fair condition. There are three areas that warrant further investigation. There are various recommendations which should be implemented by the owner.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号