首页> 美国政府科技报告 >National Program for Inspection of Non-Federal Dams. Russell Mill Pond (MA 01219), Merrimack River Basin, Chelmsford, Massachusetts. Phase 1 Inspection Report
【24h】

National Program for Inspection of Non-Federal Dams. Russell Mill Pond (MA 01219), Merrimack River Basin, Chelmsford, Massachusetts. Phase 1 Inspection Report

机译:国家非联邦大坝检查计划。 Russell mill pond(ma 01219),merrimack River Basin,Chelmsford,massachusetts。第1阶段检验报告

获取原文

摘要

The dam is of irregular composition consisting of stone and earth embankments, two sluiceways, a spillway and several stone masonry wall sections. The dam has a hydraulic height of 11 feet and an overall length of approximately 120 feet. The spillway and sluiceways have a combined capacity of 230 cfs or 22 percent of the test flood outflow with flashboards and 345 cfs of 33 percent of the test flood outflow without flashboards. The dam is in generally good condition. However, it is rated as fair due to the inadequate spillway capacity, seepage through the stone masonry below the right sluiceway outlet pipe, and the voids beneath the cracked concrete floor of the spillway. It is recommended that the owner engage a qualified registered professional engineer to perform a detailed hydraulic/hydrologic investigation to determine overtopping potential and need for the total discharge capacity of the dam; design a means to precent water from seeping through the masonry below the right sluiceway outlet pipe and investigate the voids beneath the spillway cap.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号