首页> 美国政府科技报告 >National Program for Inspection of Non-Federal Dams. Menuckatuck Reservoir Dam (CT 00408), Connecticut Central Coastal Area, Guilford, Connecticut. Phase I Inspection Report
【24h】

National Program for Inspection of Non-Federal Dams. Menuckatuck Reservoir Dam (CT 00408), Connecticut Central Coastal Area, Guilford, Connecticut. Phase I Inspection Report

机译:国家非联邦大坝检查计划。 menuckatuck水库大坝(CT 00408),康涅狄格中央沿海地区,吉尔福德,康涅狄格州。第一阶段检查报告

获取原文

摘要

Menuckatuck Reservoir Dam is a concrete gravity structure with a downstream earth embankment. The total length of the dam is 248 feet with a maximum height of 58 feet. A 42 foot wide concrete gravity spillway section is located at the right side of the dam. Concrete steps on the downstream face transmit flow to a concrete spillway raceway 300 feet long that discharges to a bedrock channel. The outlet works consist of an intake gatehouse for drawing off water to the supply system and a 36 inch diameter cast iron pipe that serves as the low level outlet. The dam is judged to be in generally good condition. The concrete surfaces were recently gunited and are in good condition. The horizontal and vertical alignment is good. The downstream earth embankment is well-maintained and did not show any evidence of sloughing or seepage. Slight erosion of the embankment was trees have been planted along the crest of the downstream embankment. The concrete spillway weir and spillway raceway are in good condition with minor seepage at construction joints on the floor of the spillway raceway. The capacity of the spillway is inadequate to pass the full PMF test flood outflow (7030 CFS) without overtopping the dam.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号