首页> 美国政府科技报告 >Interim Field Evaluation of Windrow Revetment. Missouri River, Section 32, Streambank Erosion Control
【24h】

Interim Field Evaluation of Windrow Revetment. Missouri River, Section 32, Streambank Erosion Control

机译:Windrow护岸的临时现场评估。密苏里河,第32节,streambank侵蚀控制

获取原文

摘要

The objective of this report is to describe and evaluate the performance of a low cost, environmentally acceptable erosion control technique called windrow revetment. The structure was designed, constructed, and monitored by the Omaha District, U. S. Army Corps of Engineers on the left bank of the Missouri River near Vermillion, South Dakota.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号