Identification of Causes and Analysis of Techiques for Reducing Delinquent Deliveries in Department of Defense Production Contracts

机译:减少国防部生产合同违约交付的原因识别与技术分析

获取原文

摘要

Approximately one in four Department of Defense production contracts are being carried in a delinquent status. These late deliveries have a value of several billion dollars, and eighty percent of the delinquent contracts are over ninety days late. The impact of these late deliveries effects many military organizations in a variety of ways. The causes of delinquency stem from actions of the Government and of the contractor. The Government attempts to use a number of incentives to motivate the contractor to provide timely delivery of the required items. It also utilizes a variety of procedures in an attempt to control and reduce the number of delinquent contracts. Yet a significant portion of the contracts are delinquent. The objective of this research effort was to provide a survey study of the delinquency problem, with a particular view of stimulating further in-depth research into its various aspects. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号