首页> 美国政府科技报告 >National Dam Inspection Program. Druid Hill Lake (NDI-ID Number MD-109) Patapsco River Basin, Jones Falls, Baltimore City, Maryland. Phase I Inspection Report
【24h】

National Dam Inspection Program. Druid Hill Lake (NDI-ID Number MD-109) Patapsco River Basin, Jones Falls, Baltimore City, Maryland. Phase I Inspection Report

机译:国家大坝检查计划。德鲁伊山湖(NDI-ID号mD-109)patapsco河流域,琼斯瀑布,巴尔的摩市,马里兰州。第一阶段检查报告

获取原文

摘要

Druid Hill Lake is impounded by an earthfill dam consisting of a northern, eastern, and southern embankment. The lake is a reservoir for filtered water which is pumped from the Montebello Water Purification Plant. The dam, completed in 1871, was recognized by the American Society of Civil Engineers in 1971 as a National Historical Civil Engineering Landmark. The water level of the reservoir is maintained at approximately elevation 212. The maximum pool level of elevation 216 represents the top elevation of the overflow pipe located at the eastern end of the reservoir. Water normally leaves the reservoir by gravity flow through an outlet header at the eastern end of the lake. Because all inflow into the reservoir is controlled, with the exception of rainfall directly on the lake and a small amount of surface runoff, flood routing and detailed hydraulic and hydrologic analyses are not required.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号