National Dam Safety Program. Lake Placid Village Dam. (Inventory Number NY 781), Lake Champlain River Basin, Essex County, New York. Phase I Inspection Report

机译:国家大坝安全计划。普莱西德湖村大坝。 (库存号NY 781),尚普兰河流域,埃塞克斯郡,纽约。第一阶段检查报告

获取原文

摘要

The examination of documents and visual inspection of the dam and appurtenant structures did not reveal conditions which constitute an immediate hazard to human life or property. The dam, however, has a number of problem areas which require further investigation and remedial work. The structural stability analysis indicates that the dam is unstable when subjected to forces which could occur under the Probable Maximum Flood (PMF) loading condition. Unsatisfactory stability is indicated for the dam when subject to forces which could occur during the normal winter operations and the 1/2 PMF loading condition. A structural stability investigation should be started within six months to determine the characteristics of the uplift forces acting on the dam and to determine whether the foundation acts integrally with the dam section to resist overturning. Remedial work should be completed, depending on the results of the investigation, within two years. The hydrologic/hydraulic analysis establishes the spillway capacity as 10.7% of the Probable Maximum Flood (PMF). The dam will be overtopped by 10.0 feet and 4.8 feet during the PMF and 1/2 PMF respectively. The spillway is inadequate since failure of the dam during the 1/2 PMF event will not significantly increase the downstream hazard from that which would occur just prior to the dam failure.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号