National Program for Inspection of Non-Federal Dams. Bird Pond Dam (MA 00804), Neponset River Basin, Walpole, Massachusetts. Phase 1 Inspection Report

机译:国家非联邦大坝检查计划。鸟池坝(ma 00804),Neponset河流域,马萨诸塞州沃波尔。第1阶段检验报告

获取原文

摘要

Bird Pond Dam is an 18.5 ft. high, 291 ft. long composite rubble masonry, concrete and earth embankment to consisting of a 39 ft. long central spillway, a 132 ft. long earth embankment the right of the spillway and a 120 ft. long earth embankment to the left of the spillway. The test flood outflow (15,000 cfs.) would overtop the dam by about 5.7 ft. with stop-logs in place and 5.3 with stoplogs removed. With the stoplogs in place the spillway can pass about 500 cfs of about 3 percent of the test flood outflow without overtopping the dam. With the stoplogs removed and the spillway sluice gates open the spillway can pass about 2,070 cfs or about 14 percent of the test flood outflow without overtopping the dam. The dam is judged to be in generally fair condition because of the seepage through the left spillway training wall and because the low level outlet has not been operated in many years and is presumed to be inoperative. There is brush and tree growth on the left embankment. Mortar is missing from the joints of the rubble masonry training walls of the spillway. The concrete spillway service service bridge is deteriorated. Minor erosion has taken place on the downstream slope of the left embankment. There may also be some seepage from the right spillway training wall which at the time of the inspection could not be determined because of the high flow conditions.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号