首页> 美国政府科技报告 >Worldwide Crisis Alerting Network, Phase II. Task 6. Development of WWMCCS Interface Implementation Concept
【24h】

Worldwide Crisis Alerting Network, Phase II. Task 6. Development of WWMCCS Interface Implementation Concept

机译:全球危机预警网络,第二阶段。任务6. WWmCCs接口实现概念的开发

获取原文

摘要

This report describes the resources and steps necessary to implement and operate the WCAN II and also provides a more detailed description of necessary agreements and arrangements than was provided in the Task 4 Report. Pilot system and operating system test procedures are described together with the projected resources required to conduct the tests. In addition, this report suggests future areas for improvement and expansion of the WCAN II system after actual operation has proven the effectiveness of the system. In summary, it appears that the WCAN II can be operational in a relatively short time frame and the costs to implement the system are insignificant when compared with the potential benefits of a worldwide crisis alerting network.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号