首页> 美国政府科技报告 >National Program for Inspection of Non-Federal Dams. South Reservoir Dam and Dikes, Main Dam (MA 00453), East Dike (MA 01278), West Dike (MA 01279) Massachusetts Coastal Area, Winchester, Massachusetts. Phase 1 Inspection Report
【24h】

National Program for Inspection of Non-Federal Dams. South Reservoir Dam and Dikes, Main Dam (MA 00453), East Dike (MA 01278), West Dike (MA 01279) Massachusetts Coastal Area, Winchester, Massachusetts. Phase 1 Inspection Report

机译:国家非联邦大坝检查计划。南水库大坝和堤坝,主坝(ma 00453),东堤(ma 01278),西堤(ma 01279)马萨诸塞州沿海地区,温彻斯特,马萨诸塞州。第1阶段检验报告

获取原文

摘要

The main dam is a 950 foot long, 28 foot hydraulic height earth fill embankment structure with a 25 foot long concrete spliiway at the right abutment. There are also two earthfill enbankment dikes. The west dike is about 200 ft. lonmg and has a height of 6 ft. The east dike is 100 ft. long and about 13.5 ft. in height. The dam is judged to be in generally good condition and the dikes are in fair condition. The size classification is intermediate and the hazard potential is high.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号