首页> 美国政府科技报告 >A Cost Comparison of Alternative Methods for Fleet Introduction of the CG 47 Class
【24h】

A Cost Comparison of Alternative Methods for Fleet Introduction of the CG 47 Class

机译:CG 47级舰队引进替代方法的成本比较

获取原文

摘要

Manning of new construction ships in preparation for fleet introduction requires the utilization of considerable Navy resources, both in terms of personnel lost to the fleet and dollar costs. Criticism by the General Accounting Office and Navy self-evaluation of new construction manning occurred in the 1969-1971 time-frame and resulted in the development of the Fleet Introduction Team concept. The CG 47 Class Guided Missile Cruiser construction program has fostered another alternative method for accomplishing fleet introduction, patterned after the manning concept employed in nuclear powered ship construction programs. The objective of the thesis is to evaluate the various methods of introducing a new construction ship into the fleet by accomplishing a cost comparison of different methodologies and to provide a model which can be used by the Navy on future programs to perform such an evaluation. The author's conclusions are: (1) the nucleus crew, balance crew concept is becoming obsolete; (2) use of the Fleet Introduction Team concept should be expanded; and (3) there is a need for early decisions relative to manning new construction ships. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号