首页> 美国政府科技报告 >National Dam Safety Program. Main Mill Dam (Inventory Number N.Y. 262), Lake Champlain Basin, Clinton County, New York. Phase I Inspection Report
【24h】

National Dam Safety Program. Main Mill Dam (Inventory Number N.Y. 262), Lake Champlain Basin, Clinton County, New York. Phase I Inspection Report

机译:国家大坝安全计划。主磨坝(库存编号N.Y. 262),尚普兰湖盆地,克林顿县,纽约。第一阶段检查报告

获取原文

摘要

This report provides information and analysis on the physical condition of the dam as of the report date. Information and analysis are based on visual inspection of the dam by the performing organization. Visual inspection of this dam did not reveal conditions which constitute an immediate hazard to human life or property. However, the dam has some deficiencies which require further engineering investigations and remedial work. Structural stability analyses performed for this report indicate that the spillway section is unstable for all conditions studied. The analysis was based on the limited information available and so may not reflect existing conditions. However, the analysis does indicate that there is a serious question concerning the stability of this dam and further investigations are required. It is recommended that within 3 months of the date of notification of the owner, investigations into the structural stability deficiencies should be commenced. These studies should include developing accurate cross sections of the dam, progressing subsurface explorations, and coring the dam. This information should then be incorporated into a detailed stability evaluation and the need for modifications to the structure should be determined. Required changes of the structure should be completed within 18 months.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号