首页> 美国政府科技报告 >National Dam Safety Program. Lake Mahopac Dam (Inventory Number NY 1329) Lower Hudson River Basin, Putnam County, New york. Phase I Inspection Report
【24h】

National Dam Safety Program. Lake Mahopac Dam (Inventory Number NY 1329) Lower Hudson River Basin, Putnam County, New york. Phase I Inspection Report

机译:国家大坝安全计划。 Lake mahopac Dam(库存号NY 1329)下哈德逊河流域,普特南县,纽约。第一阶段检查报告

获取原文

摘要

The examination of documents and the visual inspection of Lake Mahopac Dam and its appurtenant structures did not reveal conditions which constitute an immediate hazard to human life and property. Using Corps of Engineers screening criteria, it has been determined that the dam would be overtopped for all storms exceeding approximately 56 percent of Probable Maximum Flood (PMF). The maximum spillway discharge capacity is 7.9 percent of the PMF peak outflow. The spillway is, therefore, adjudged as 'inadequate'. The following remedial measures should be performed within 12 months from notification: (1) Missing portions of the upstream stone masonry wall should be repaired. (2) Brush and shrubbery should be removed from the embankment, spillway-reservoir drain structure and downstream channel. Provide a program of periodic cutting and or mowing of the dam surfaces, spillway-reservoir drain structure and the downstream channel. (3) The collected debris at the spillway-reservoir drain structure and in the downstream channel should be removed and hauled away from the dam. (4) A program of periodic inspections and maintenance of the dam and appurtenances should be provided, including yearly operation and lubrication of the reservoir drain and its control facilities. This information should be documented for future reference. (5) An emergency action plan for the project should be developed.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号