首页> 美国政府科技报告 >National Program for Inspection of Non-Federal Dams. New Pond Dam (MA 00779), Massachusetts Coastal Basin, Easton, Massachusetts. Phase 1 Inspection Report
【24h】

National Program for Inspection of Non-Federal Dams. New Pond Dam (MA 00779), Massachusetts Coastal Basin, Easton, Massachusetts. Phase 1 Inspection Report

机译:国家非联邦大坝检查计划。新池塘坝(ma 00779),马萨诸塞州沿海盆地,伊斯顿,马萨诸塞州。第1阶段检验报告

获取原文

摘要

The dam is about 1100 ft. long with a maximum height of about 14 ft. It is considered to be in fair condition. It is small in size with a significant hazard potential. Technical inspections should be performed every year by a qualified, registered engineer. (Author).

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号