首页> 美国政府科技报告 >National Program for Inspection of Non-Federal Dams. Guilford Lakes Upper Dam (CT 00412), Connecticut Coastal Basin, Guilford, Connecticut. Phase I Inspection Report
【24h】

National Program for Inspection of Non-Federal Dams. Guilford Lakes Upper Dam (CT 00412), Connecticut Coastal Basin, Guilford, Connecticut. Phase I Inspection Report

机译:国家非联邦大坝检查计划。吉尔福德湖上坝(CT 00412),康涅狄格州沿海盆地,吉尔福德,康涅狄格州。第一阶段检查报告

获取原文

摘要

Guilford Lakes Upper dam is a 200 foot long earthfill structure. The earth embankment has vertical walls on the upstream and downstream faces, and has a crest width of 26 feet. The upstream face is a grouted masonry wall and the downstream face is dry masonry. The dam has two adjacent spillways, a low level outlet, and an emergency overflow. Based on a visual inspection at the site, the dam is considered to be in FAIR condition. However, there are several areas of concern which must be corrected to assure the long-term performance of this dam. It is recommended that the owner engage the services of a registered engineer experienced in the design of dams to accomplish the following: (1) Perform a detail hydrologic/hydraulic investigation to assess further the need for and the means to increase project discharge capacity and the ability of the dam to withstand overtopping; (2) Recommend methods to repair or seal the crushed left overflow pipe; (3) Provide procedures for removal of brush, trees, and root systems to a distance of 15 ft downstream from the dam, and select soils to refill any resulting holes. The maximum spillways and emergency overflow capacity is equal to 635 CFS, which represents 14% of the test flood outflow.

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号