首页> 美国政府科技报告 >National Dam Inspection Program. Duck Pond Dam (NDI ID Number PA-00379, DER ID Number 35-98), Susquehanna River Basin, Tributary to South Branch Tunkhannock Creek, Lackawanna County, Pennsylvania. Phase I Inspection Report
【24h】

National Dam Inspection Program. Duck Pond Dam (NDI ID Number PA-00379, DER ID Number 35-98), Susquehanna River Basin, Tributary to South Branch Tunkhannock Creek, Lackawanna County, Pennsylvania. Phase I Inspection Report

机译:国家大坝检查计划。 Duck pond Dam(NDI ID号pa-00379,DER ID号35-98),susquehanna河流域,支流到南支Tunkhannock Creek,Lackawanna县,宾夕法尼亚州。第一阶段检查报告

获取原文

摘要

The visual inspection and review of available data indicate that Duck Pond Dam is in fair condition. The lack of embankment protection from spillway flows and the inadequate spillway capacity are the primary deficiencies which cause concern for the safety of this dam. In accordance with the recommended guidelines, the Spillway Design Flood (SDF) for this facility is in the range of the 100 year flood to 1/2 the Probable Maximum Flood (PMF). Based on the size of the dam and degree of downstream hazard, the selected SDF is the 100 year flood. The hydrologic and hydraulic computations indicate that the combination of reservoir storage and outlet works discharge capacity will not pass the SDF (100 year flood) prior to overtopping the embankment. In accordance with the criteria outlined and evaluated in Section 5.5 of this report, the discharge capacity for Duck Pond Dam is considered to be inadequate.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号