首页> 美国政府科技报告 >Pawcatuck River and Narragansett Bay Drainage Basins Water and Related Land Resources Study. Big River Reservoir Project. Volume I. Main Report
【24h】

Pawcatuck River and Narragansett Bay Drainage Basins Water and Related Land Resources Study. Big River Reservoir Project. Volume I. Main Report

机译:pawcatuck河和Narragansett湾排水盆地水和相关的土地资源研究。大河水库工程。第一卷主要报告

获取原文

摘要

This feasibility study has examined various alternatives to meet water supply, flood control and recreation needs in the Big River study area. Of the methods studied to satisfy the water supply needs of the study area, demand modification (water conservation), groundwater and surface water development were determined to be most feasible alternatives. Flood control storage at Big River Reservoir was found to be the most feasible method of flood damage reduction in the Pawtuxet basin. Recreation needs were best met by recreational development at the Big River site, to a maximal level consistent with the water supply purpose of the reservoir. This report recommends that the United States Congress authorize a plan of water resources development for the metropolitan Providence area that includes: (1) a multiple purpose reservoir providing water supply, flood control and recreation at the Big River site; (2) development of local groundwater in certain areas as water supply sources; and (3) a water conservation program for the entire metropolitan area. Of this overall water resources plan, the report recommends Federal construction of the $155.5 million Big River dam and reservoir project, excluding those elements which are not within Corps of Engineers implementation authority.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号