首页> 美国政府科技报告 >Archaeological Salvage of the Joso Trestle Construction Camp, 45-FR-51 Lower Monumental Project
【24h】

Archaeological Salvage of the Joso Trestle Construction Camp, 45-FR-51 Lower Monumental Project

机译:Joso Trestle施工营的考古救助,45-FR-51低纪念性项目

获取原文

摘要

A major Pacific Northwest transportation camp, the Joso Bridge site was occupied from about 1913 until completion of the trestle in 1914. A notable engineering feat of its time, Joso Bridge is even now in daily use by the Union Pacific Railroad. Salvage excavations were made necessary by proposed fish hatchery construction, which will obliterate the greater portion of the camp area. Interpretation of the site is complicated by the fact that the camp buildings were dismantled and removed following completion of the trestle; however, early photographs do exist and it has been possible to make some correlation with what little structural evidence remains below ground. Because the Northern Pacific's Perry Station section house was also located nearby, the opportunity exists to make comparisons between the consumption and disposal habits of a more settled section foreman with those of the itinerant ironworkers. Additionally, the artifact analysis has provided a great deal of specific information about the camp and its workers, especially their leisure-time activities, among which were drinking and poker-playing. While it was hoped that some evidence of the crew's ethnic makeup might emerge, a few sherds of Chinese ceramics were the only archaeological clues to the possible ethnic origin of perhaps one camp member, although documentary research has provided us with the name of an Irish workman.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号