首页> 美国政府科技报告 >Preparing for Phase II: A Guide to the Pay/Personnel Administrative Support System (PASS) Source Data System (SDS) Site Preparation Process for PASS Field Managers
【24h】

Preparing for Phase II: A Guide to the Pay/Personnel Administrative Support System (PASS) Source Data System (SDS) Site Preparation Process for PASS Field Managers

机译:为第二阶段做准备:pass现场经理的薪酬/人事管理支持系统(pass)源数据系统(sDs)现场准备流程指南

获取原文

摘要

This thesis presents an initial orientation and general overview of the physical and managerial aspects of the field level site preparation process for the Source Data System (SDS), the automated distributed processing system which will implement Phase II of the Pay/Personnel Administrative Support System (PASS). It describes a systematic approach to terminal and printer requirements and allocation analysis, configuration design, and management of field level site preparation activities for a selected configuration. Forms and checklists developed by the author to implement the approach are described and explained in the main body of the thesis and included as Appendices. While the thesis specifically addresses the PASS/SDS system, the approach, forms and checklists developed could easily be adapted for use in supporting remote entry level site preparation involved in any distributed processing system. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号