首页> 美国政府科技报告 >National Dam Safety Program. Eden Mill Dam (NJ00791), Whippany River Basin, Whippany River, Morris County, New Jersey. Phase I Inspection Report
【24h】

National Dam Safety Program. Eden Mill Dam (NJ00791), Whippany River Basin, Whippany River, Morris County, New Jersey. Phase I Inspection Report

机译:国家大坝安全计划。伊甸磨坊大坝(NJ00791),惠帕尼河流域,惠帕尼河,莫里斯县,新泽西州。第一阶段检查报告

获取原文

摘要

This report cites results of a technical investigations as to the dam's adequacy. The inspection and evaluation of the dam is as prescribed by the National Dam Inspection Act, Public Law 92-367. The technical investigation includes visual inspection, review of available design and construction records, and preliminary structural and hydraulic and hydrologic calculations, as applicable. An assessment of the dam's general condition is included in the report. (Author)

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号