首页> 美国政府科技报告 >Preliminary Engineering Study of Long-Lead Time Equipment Required for Large Lightweight Mirror Manufacture
【24h】

Preliminary Engineering Study of Long-Lead Time Equipment Required for Large Lightweight Mirror Manufacture

机译:大型轻型镜制造所需长时间设备的初步工程研究

获取原文

摘要

This technical report develops design concepts for equipment required for the manufacture of large lightweight mirror blanks by the fusion technique. An earlier study identified this equipment as long lead time equipment critical to a mirror manufacturing schedule. The equipment addressed in this report includes: 100 in. glassmaker furnace, core maker, annealer and fusion sealing furnace. Cost estimates to complete detailed engineering and construction of equipment are developed. Timing schedules for the design, construction and installation of this equipment show that the core maker is the longest delivery item, requiring 25 months to complete. No technical problems have been identified. The report recommends that detail design engineering on critical equipment and preliminary engineering on other equipment be initiated. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号