首页> 美国政府科技报告 >National Dam Safety Program. East Canada Lake Dam (Inventory Number NY 201), Mohawk River Basin, Herkimer and Montgomery Counties, New York. Phase I Inspection Report
【24h】

National Dam Safety Program. East Canada Lake Dam (Inventory Number NY 201), Mohawk River Basin, Herkimer and Montgomery Counties, New York. Phase I Inspection Report

机译:国家大坝安全计划。加拿大东部湖坝(库存编号NY 201),莫霍克河流域,Herkimer和蒙哥马利县,纽约。第一阶段检查报告

获取原文

摘要

The examination of documents and visual inspection of the East Canada Lake Dam did not reveal conditions which constitute an immediate hazard to human life or property. However, the dam has some deficiencies which require remedial work. The hydrologic/hydraulic analysis indicates that the dam will be overtopped by flows in excess of 48 percent of the Probable Maximum Flood (PMF). The dam will be overtopped by 4.9 feet and 0.09 feet by the PMF and 1/2 PMF respectively. Failure of the dam during the 1/2 PMF event would significantly increase the downstream hazard from that which would exist just prior to failure of the dam. The spillway capacity, therefore, is assessed as seriously inadequate and the dam is assessed as unsafe, non-emergency. The structural analysis for the concrete spillway section indicates satisfactory stability for all loading conditions investigated.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号