首页> 美国政府科技报告 >National Program for Inspection of Non-Federal Dams. Lake Christina Dam (ME 00226), Saint John River Basin, Fort Fairfield, Maine. Phase 1 Inspection Report
【24h】

National Program for Inspection of Non-Federal Dams. Lake Christina Dam (ME 00226), Saint John River Basin, Fort Fairfield, Maine. Phase 1 Inspection Report

机译:国家非联邦大坝检查计划。克里斯蒂娜湖水坝(mE 00226),圣约翰河流域,费尔菲尔德堡,缅因州。第1阶段检验报告

获取原文

摘要

The dam is an earthfill structure that is about 5800 ft. long and thirty ft. high. It is intermediate in size with a hazard potential of high. In event of failure of the dam there is the potential for loss of more than a few lives. No urgent or emergency actions are required for the dam based on this inspection. Remedial measures include repairing the damaged intake structure concrete and the stop logs, removing the trash from the reservoir along the dam and cutting the overgrown vegetation from the embankments. (Author).

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号