首页> 美国政府科技报告 >Buffalo Metropolitan Area, New York. Water Resources Management Study. Tonawanda Creek Watershed. Interim Flood Management Study
【24h】

Buffalo Metropolitan Area, New York. Water Resources Management Study. Tonawanda Creek Watershed. Interim Flood Management Study

机译:布法罗大都会区,纽约。水资源管理研究。 Tonawanda Creek Watershed。临时洪水管理研究

获取原文

摘要

This report recommends construction of the Batavia Reservoir Compound modified alternative to provide flood damage reduction in the Tonawanda Creek Watershed, N.Y. The alternative consists of two shallow detention reservoirs (normally dry) arranged in series. The reservoirs would be formed by construction of two earth dams. Each dam would have principle outlet works comprised of side-by-side conduits; five for the upper dam and four for the lower, with dimensions of 11 feet by 11 feet. Each conduit would be equipped with an electrically operable gate and provisions for manual operation. The spillways of both dams would be riprapped on the upstream and downstream and crets. The amount of reservoir flood control stroage and operation of the selected plan were developed to meet the planning objectives of the study. The degree of protection afforded by the plan is approximately 500-year in the city of Batavia and variable downstream.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号