首页> 美国政府科技报告 >System Engineering Analysis of Feed and Condensate System Installed on LHA-1 and LPH-2 Class Ships
【24h】

System Engineering Analysis of Feed and Condensate System Installed on LHA-1 and LPH-2 Class Ships

机译:LHa-1和LpH-2级船舶进料和凝结水系统的系统工程分析

获取原文

摘要

The goal of an engineered operating cycle (EOC) program is to effect an early improvement in the material condition of ships at an acceptable cost, while maintaining or increasing their operational availability during an extended operating cycle. In support of this goal, system engineering analyses (SEAs) are being conducted for various ship classes on selected mission-critical systems and subsystems that have historically exhibited relatively high maintenance burdens. This report documents the SEA for the Feed and Condensate Systems on LHA-1 and LPH-2 Class ships.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号