首页> 美国政府科技报告 >Process Design and Cost Estimating Algorithms for the Computer Assisted Procedure for Design and Evaluation of Wastewater Treatment Systems (CAPDET)
【24h】

Process Design and Cost Estimating Algorithms for the Computer Assisted Procedure for Design and Evaluation of Wastewater Treatment Systems (CAPDET)

机译:污水处理系统设计和评估计算机辅助程序的工艺设计和成本估算算法(CapDET)

获取原文

摘要

The need for a method of accurate and rapid preliminary design, and cost estimating for wastewater treatment plant construction projects has long been recognized. Various models have been developed which purport to prepare planning or design level cost estimates. Few of these models are responsive to the requirements of the planner or engineer responsible for accurately projecting construction costs for the purpose of alternative evaluation. The CAPDET model was developed with the specific intent of assisting personnel responsible for wastewater treatment planning in the evaluation of wastewater treatment alternatives based primarily on life cycle costs and degree of treatment provided. This cost estimating procedure uses both parametric and unit cost estimating techniques. (Author)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号