首页> 美国政府科技报告 >Energy Engineering Analysis, Twin Cities Army Ammunition Plant, New Brighton, Minnesota; Executive Summary.
【24h】

Energy Engineering Analysis, Twin Cities Army Ammunition Plant, New Brighton, Minnesota; Executive Summary.

机译:能源工程分析,双城军队弹药厂,新布赖顿,明尼苏达州;执行摘要。

获取原文

摘要

This analysis is undertaken to assist the Twin Cities Army Ammunition Plant (TCAAP) in meeting the goals established by the Army Facilities Energy Plan to reduce energy consumption by 20 percent by FY 85. Projects selected for implementation as a result of this analysis will enable TCAAP to achieve the FY 85 goal. These projects have been divided into standby and mobilization status. Total energy savings resulting from standby status project implementation will be approximately 130,800 MBTU's at a total estimated cost of $4.2 million. If mobilization status projects are implemented annual energy savings will be approximately 626,300 MBTU's during periods of full mobilization. The cost of implementing mobilization status projects is estimated at $12.9 million.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号