首页> 美国政府科技报告 >Energy Engineering Analysis Program. Increments A, B, F and G, U.S. Army Rock Island Arsenal, Illinois. Volume 1 - Executive Summary.
【24h】

Energy Engineering Analysis Program. Increments A, B, F and G, U.S. Army Rock Island Arsenal, Illinois. Volume 1 - Executive Summary.

机译:能源工程分析计划。增加a,B,F和G,美国伊利诺伊州陆军岩岛阿森纳。第1卷 - 执行摘要。

获取原文

摘要

Objectives and Scope As stated in the EEAP Scope of Work the overall objectives were: (a) Develop a systematic plan of projects that will result in the reduction of installation energy consumption in compliance with the Army Facilities Energy Plan. (b) Develop Coordinated Basewide Energy System Plans. (c) Prepare Project Development Brochures (PDBs), DD Forms 1391 and supporting documentation for all feasible energy conservation projects. The Scope of Work further defined the objectives and scope of each work increment to be as follows: Increment A - ECIP* Projects for Buildings and Processes Increment B - ECIP Projects for Utilities, Energy Distribution Systems and Energy Monitoring and Control Systems (EMCS) Increment C - Renewable Energy Systems Projects Increment D - Cogeneration and Solid Waste Plants Projects Increment E - Central Boiler Plant Projects Increment F - Facilities Engineer Conservation Measures Increment G - Projects Identified in Increments A and B that do not qualify under ECIP criteria This submittal presents the final results for Increments A, B, F and G through a description of those energy conservation opportunities (ECOs) and ECIP projects that were identified and evaluated as part of these work increments. Increments C, D and E have not been authorized at this time for Rock Island Arsenal.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号