首页> 美国政府科技报告 >Analysis of Multi-Year Procurement Cost Estimating Methods at the Aeronautical Systems Division
【24h】

Analysis of Multi-Year Procurement Cost Estimating Methods at the Aeronautical Systems Division

机译:航空系统部门多年采购成本估算方法分析

获取原文

摘要

Multi-year procurement (MYP) has been receiving increased emphasis generated by high levels in DOD. Although the benefits resulting from MYP have been identified from many different sources, the cost savings attributed to those benefits are often difficult to identify. Cost estimates of those savings often lack credibility. This research effort examined cost estimating methods for five different MYP programs at the Aeronautical Systems Division. Reasons for cost savings are identified and those savings are quantified for each program. Similarities and differences in Program Office savings attributable to different areas (key variables) are determined and general areas of cost savings to be considered in estimating MYP are identified.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号