首页> 美国政府科技报告 >National Shipbuilding Research Program. Semi-Automatic Pipe Handling System and Fabrication Facility. Phase II - Implementation.
【24h】

National Shipbuilding Research Program. Semi-Automatic Pipe Handling System and Fabrication Facility. Phase II - Implementation.

机译:国家造船研究计划。半自动管道处理系统和制造设施。第二阶段 - 实施。

获取原文

摘要

The primary objective of this project was to design, install and evaluate an integrated semi-automatic pipe shop for the manufacture and assembly of shipboard piping systems. This facility will reduce the labor, material handling required and increase the flow through the system for a given space requirement and provide for storage as well as fabrication area. The project was conducted in such a way as to provide full viability to all U. S. shipyards during the design, installation. and evaluation phases. This was accomplished through Avondale's (ASI) interaction with Panel SP-1 of the Ship Production Committee as part of the National Shipbuilding Research Program. The magnitude of this project required subdividing the total project into sub- projects functionally oriented. During the project any one of the sub-projects could be developed independent of the other in respect to function, equipment, design or selection. Attention was given to sub-project interface to assure total project integration.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号