首页> 美国政府科技报告 >BIW Phase III/FY-82 Shipyard Data Application Program Panel Line/Shop Scheduling and Manloading Incentive System Evaluation (Welding).
【24h】

BIW Phase III/FY-82 Shipyard Data Application Program Panel Line/Shop Scheduling and Manloading Incentive System Evaluation (Welding).

机译:BIW第三期/ FY-82船厂数据应用程序面板线/车间调度和装载激励系统评估(焊接)。

获取原文

摘要

This project has evolved from the National Shipbuilding Research Program which is funded by the Maritime Administration, United States Department of Transportation, for the purpose of making domestic shipyards more competitive with foreign shipyards. Technical direction for this program is provided by the Ship Production Committee of the Society of Naval Architects and Marine Engineers. The Ship Production Committee is composed of several panels, two of which, Panel SP-8 on Industrial Engineering, arid Panel SP-G on Shipbuilding Standards, make up the Ship Producibility Research Program, managed by Bath Iron Works Corporation, Bath, Maine.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号